Skip to main content

Measure and Calculate Total Rise — Determine Total Rise and Run

Beginner4 hours

Part of project

How to Lay Out a Stair Stringer with a Framing Square · Step 1 of 6

Helpful?

In this video

The first step in calculating stairs is to determine the total rise, which is the vertical distance from finished floor to finished floor. The presenter measures from the top of the main floor's subfloor (rim) to the upstairs subfloor. He gets 118 and 5/8 inches. Since the finished floor on both levels will be 3/4 inch thick (hardwood downstairs, carpet and pad upstairs), he adds 3/4 inch to his measurement using a construction calculator (BuildCalc). The final total rise is 119 and 3/8 inches. This ensures that all individual risers will be equal in height after the finished floor is installed.

17.0K views813
stairbuilding

75K subscribers

View Channel

FAQs

What is the most critical tool for ensuring accurate stair stringer layout?

The framing square, especially when used with stair gauges, is indispensable for consistently marking the rise and run on the stringer. A construction calculator is also highly recommended to minimize mathematical errors and ensure precise measurements.

How important is accuracy when marking a stair stringer, and what are the safety implications?

Accuracy is paramount for safety; even small errors can lead to uneven steps, creating a significant tripping hazard. Double-check all measurements and markings before cutting, as consistent riser heights and tread depths are crucial to prevent falls.

Can I use different materials for stair stringers, or is pressure-treated pine always necessary?

While pressure-treated pine is excellent for outdoor use or areas prone to moisture, untreated lumber like Douglas fir or Southern Yellow Pine can be used for indoor stairs. Always select straight, knot-free lumber of appropriate dimensions that meets local building codes for structural integrity.

What's a common mistake beginners make when laying out stringers, and how can I avoid it?

A frequent error is forgetting to account for the thickness of the treads and the necessary bottom cut for the finished floor. Ensure you deduct the tread thickness from the bottom riser and factor in the nosing overhang for consistent steps from top to bottom.

Transcript
Hide

quality. All right, so the first thing I need to know for stairs is my total rise. And ideally, that is finished floor to finished floor. In my case, I have hardwood on the main floor, which is 3/4. Upstairs, I have carpet and pad, which is 3/4. So, this is really easy. I don't have to account for that or there's no there's no difference. So, I just need my floor to floor measurement. So, I have from the top of my rim to my subfloor 118 and 5/8, but I know I'm going to have 3/4 in subfloor up above. So, I need to add that. So, 118 and 5/8 plus 3/4 119 and 3/8. That is the rise that I will divide out to get equal stairs all the way up. 119 and 3/8. I know a guy that forgets these things. 119 and 3/8. 119 and 38. 119 and 38. There's a nail. Okay, let's take a look at the plans because I need to know how many rises do I have total on the second floor plan.

Auto-generated transcript. May contain errors.