Site Preparation and Initial Excavation

0:04
18:39
79.2K views

At 0:04 in

Building a flagstone wall and prepping for pavers day1

What happens here

Begin by assessing the tight job site conditions, noting challenges like narrow access between houses and city regulations that restrict equipment parking. Unload pallets of natural stone and bags of pavers (though pavers are later moved) using a skid steer. Start the initial rough excavation of the old driveway area using a mini excavator and a skid steer, removing existing soil and the top layer of old, compacted driveway material. Ensure the excavation is careful to avoid disturbing the existing subsoil more than necessary, as it is hyper-compacted from nearly 100 years of use.

Goal: Prepare the job site by assessing access, unloading materials, and commencing initial excavation using heavy machinery to remove existing soil and old driveway material. This establishes the rough grade for both the retaining wall and the future paver parking pad.

Tools and materials

  • Mini Excavator
  • Rakes
  • Shovels
  • Skid Steer

What they say

Hide

alright guys it's an interesting one today the boys don't have such a hot time out on their job site the site itself is so tight that they can't even turn around on it is much done today as we want to our dig I don't want to real fast but plus the city of st. Paul is throwing regulations down on them that doesn't allow them to actually leave a piece of equipment parked on to the street plus we've got rain coming in the forecast plus we come across an unexpected obstacle how can it be a bad day alright so here is what we got going on this all used to be a driveway the homeowner is wanting to turn this into like like a planting area she's a very eco conscience which I think a little cool with what she's got going on in like the backyard but what we're doing here today is we're gonna be building a little flagstone walk right through here with those guys to hold all this black dirt planting area back and then we're gonna turn this little area from here to the street you know a parking area the wall and parking pad will not be connected so each will be built separately this area was a driveway for nearly a hundred years so the material that's under there is hyper compacted so they don't want to disturb it any more than they have to how far down do we got to dig up here then for the wall although the wall in the paper parking spot are going to be completely separate Blaine still wants to do a rough cut on the top elevation of the pavers because that will determine the bottom elevation of the retaining wall he's got to be careful not to over dig or go too deep he doesn't want to disturb the subsoil so big ones on the bottom obviously yeah all right I'm gonna start starting to do those though so this dark looking material that the