Address Tricky Retaining Wall Corner
At 12:08 in
Building a flagstone wall and prepping for pavers day1
What happens here
A critical detail involves addressing a deteriorated corner of an existing timber retaining wall. This section needs stabilization before the new sub-base for the parking pad is installed. Since heavy machinery cannot safely excavate this area without undermining the existing structure, the work is performed manually. Workers carefully dig out enough space by hand and then dry-stack new stones to create a stable, supportive corner. This ensures the integrity of the existing wall and prevents it from collapsing when the new base material is added and compacted. This is a delicate process requiring precision to avoid damaging the old wall.
Goal: The challenging corner of an existing timber retaining wall is addressed by hand-excavating and dry-stacking new stones to stabilize the area before the new base material is brought in.
Tools and materials
- Flagstones
- Shovels
- Small Rakes/Hand Tools
- Work Gloves
What they say
(827 characters)Hide
What they say
(827 characters)Auto-generated from the video audio.