Address Tricky Retaining Wall Corner

12:08
18:39
79.2K views

At 12:08 in

Building a flagstone wall and prepping for pavers day1

What happens here

A critical detail involves addressing a deteriorated corner of an existing timber retaining wall. This section needs stabilization before the new sub-base for the parking pad is installed. Since heavy machinery cannot safely excavate this area without undermining the existing structure, the work is performed manually. Workers carefully dig out enough space by hand and then dry-stack new stones to create a stable, supportive corner. This ensures the integrity of the existing wall and prevents it from collapsing when the new base material is added and compacted. This is a delicate process requiring precision to avoid damaging the old wall.

Goal: The challenging corner of an existing timber retaining wall is addressed by hand-excavating and dry-stacking new stones to stabilize the area before the new base material is brought in.

Tools and materials

  • Flagstones
  • Shovels
  • Small Rakes/Hand Tools
  • Work Gloves

What they say

Hide

with that tricky retaining wall we know they can't dig it out with a piece of equipment and jeopardize undermining it so everything has to be done by hand okay I got that this all excavated down how they are definitely gonna need to do a thing over there after they've got the sub-base expose they immediately bring in new class-five and get that prepped and ready I think that's good go check alright class 5 using the class 5 for the base for the compaction you don't need the drainage like you would with the 3/4 clear behind the wall just cuz this finds we import new classified base even though it was an existing driveway there before simply because it gives us control we know exactly what material we're going to be installing our new paper driveway on and so this has to be levelled and compacted before it can be used