Excavate and Prepare Retaining Wall Trench
At 0:47 in
Building a flagstone wall and prepping for pavers day1
What happens here
Using a mini excavator, the crew begins digging a trench where the new flagstone retaining wall will be constructed. The site was previously a driveway for nearly a century, resulting in hyper-compacted subsoil beneath the surface. To maintain stability, the crew aims to minimize disturbance to this compacted layer, carefully excavating only to the necessary depth for the wall's base. String lines are used to guide the excavation depth, which is set to about a foot below the intended final height of the adjacent paver parking pad, ensuring the correct starting elevation for the retaining wall.
Goal: The crew excavates the existing soil to create a stable trench for the retaining wall, ensuring proper depth and avoiding disturbance of the existing compacted subsoil.
Tools and materials
- Mini Excavator (Bobcat 325)
- Rakes
- Shovels
- String Line and Stakes
What they say
(1,218 characters)Hide
What they say
(1,218 characters)Auto-generated from the video audio.