Refine Sub-Cut for Parking Pad

7:00
18:39
79.2K views

At 7:00 in

Building a flagstone wall and prepping for pavers day1

What happens here

After the initial rough grading, set up string lines across the parking pad area to establish the precise depth and pitch. The parking pad will not be flat but will have a consistent angle from the existing driveway up to the new retaining wall. Use the mini excavator to perform the final 'sub-cut', carefully removing soil to achieve the exact desired depth relative to the string lines. This precision is critical because the depth of the sub-cut dictates the final height of the base material, sand, and pavers. Regular measurements from the string line are taken to ensure accuracy and prevent over-excavation. Be particularly careful in areas adjacent to existing structures or old retaining walls to avoid undermining them.

Goal: Precisely excavate the sub-base for the paver parking pad using a mini excavator and string lines to ensure the correct depth and desired pitch.

Tools and materials

  • Mini Excavator
  • Shovels
  • String Line
  • Tape Measure

What they say

Hide

yeah two hours the next step is to excavate for the parking pad but there's a fairly substantial challenge that they've still yet to overcome going on it's where we have to excavate down to is really gonna undermine the corner of this slab and really undermined this busted wall that they got so what we're gonna do so we're gonna have to build a small wall along here to hold all that earthbag and not undermining everything more than the first step will be to shaved the old driveway material off using the cat skid loader but when it comes to making the final sub cut we're going to switch and use the mini excavator simply because we don't want to drive on that sub base material any more than we have to because every time we put tracks on it we risk loosening it up so after we get the old material shaved off we'll make the final cut with the Mini X you'll see that in a minute [Music] drinking coffee oh geez I [Music] this parking pad we is not going to be flat it's actually going to have an angle throughout the entire thing to match up with the pitch that's going from the existing driveway up to the retaining wall so a string line is set up to make sure that we keep a consistent depth for our base material our sand and our pavers which ultimately will get laid [Music] so as Blaine is excavating down Sam simply measures from the string line down to the sub cut on top of that goes the base material on top of that goes the sand and then on top of that goes the pavers so he wants to make sure that the sub cut is right in the first place but before they get too far into the date they've still got a tricky corner they got to figure out here it's busy fishing down so we're gonna be below they can still do a little bit more of the excavation with the equipment before they've got to switch over and make a different plan and to make it even more interesting technically by the rules of st. Paul we're not allowed to park in front of our jobsite so someone has to man the truck the entire time for us to be able to load it when the guys are running heavy equipment like this they can't really hear each other so they typically communicate using hand signals which you'll see in just a moment alright so you want to be a foot [Music] he's just taking nice little scoops at a time that's weird we don't want to get any deeper than a foot rain is in the forecast and both