Fine Grade Excavation for Parking Pad
At 10:04 in
Building a flagstone wall and prepping for pavers day1
What happens here
After the rough excavation, the mini excavator is brought in to perform the final, precise sub-cut for the paver parking pad. This detailed work is essential to achieve the correct and consistent depth across the entire area, guided by string lines and constant measurement. The goal is to reach a depth that will accommodate the compacted base material, a layer of sand, and the pavers themselves, while maintaining the intended pitch for water drainage. This meticulous approach prevents over-digging, which could destabilize the subsoil.
Goal: Using a mini excavator and string lines, the sub-base for the parking pad is precisely excavated to the final depth, ensuring proper elevation for drainage and paver installation.
Tools and materials
- Measuring Tape
- Mini Excavator (Bobcat 325)
- String Line and Stakes
What they say
(508 characters)Hide
What they say
(508 characters)Auto-generated from the video audio.