Skip to main content

Fine Grade Excavation for Parking Pad

10:04
18:39
79.2K views

At 10:04 in

Building a flagstone wall and prepping for pavers day1

What happens here

After the rough excavation, the mini excavator is brought in to perform the final, precise sub-cut for the paver parking pad. This detailed work is essential to achieve the correct and consistent depth across the entire area, guided by string lines and constant measurement. The goal is to reach a depth that will accommodate the compacted base material, a layer of sand, and the pavers themselves, while maintaining the intended pitch for water drainage. This meticulous approach prevents over-digging, which could destabilize the subsoil.

Goal: Using a mini excavator and string lines, the sub-base for the parking pad is precisely excavated to the final depth, ensuring proper elevation for drainage and paver installation.

Tools and materials

  • Measuring Tape
  • Mini Excavator (Bobcat 325)
  • String Line and Stakes

What they say

Hide

and to make it even more interesting technically by the rules of st. Paul we're not allowed to park in front of our jobsite so someone has to man the truck the entire time for us to be able to load it when the guys are running heavy equipment like this they can't really hear each other so they typically communicate using hand signals which you'll see in just a moment alright so you want to be a foot [Music] he's just taking nice little scoops at a time that's weird we don't want to get any deeper than a

Auto-generated from the video audio.