Continue Dry-Stacking Retaining Wall

6:03
18:39
79.2K views

At 6:03 in

Building a flagstone wall and prepping for pavers day1

What happens here

Building on the first course, additional layers of flagstones are dry-stacked. The masons continue to select stones that fit together as closely as possible, using smaller fragments to wedge and support larger pieces. The goal is to create a strong, stable wall by maximizing contact points between stones and ensuring that the wall slightly leans into the retained soil (battering). The technique focuses on the natural interlocking and frictional forces between the stones, combined with the stable base. The appearance is rustic and natural, characteristic of a dry-stacked wall. If this were a mortared wall, thin layers of mortar would be applied between each stone to bind them together.

Goal: Subsequent courses of flagstones are added, with careful selection and placement to ensure stability and a pleasing aesthetic, again without visible mortar joints.

Tools and materials

  • Flagstones
  • Rubber Mallet/Hammer
  • Small Shovel/Trowel
  • Work Gloves

What they say

Hide

so you might have noticed but as the boys are building up the wall they use smaller fragments of the stones to help support the larger ones as they play stuff Blaine gets the biggest heaviest pieces he can for that step unit and a lot of times a piece has to come out to get a different piece that will make the puzzle complete our wall is done with just a scrap pile of rock to choose from this was the best that we could pull off I'll put a little step in here for her she's a little Vance than our age yeah how long did that take like two hours

Auto-generated from the video audio.