Install and Compact New Class 5 Base
At 13:23 in
Building a flagstone wall and prepping for pavers day1
What happens here
New Class 5 base material, composed of 3/4-inch limestone rock with fines, is brought in and dumped into the excavated parking pad area. Unlike the recycled Class 5 used for the retaining wall base, this material is specifically designed for sub-base preparation for pavers. The material is spread using a skid steer and then leveled by hand with rakes. String lines are used to check the elevation, aiming for 3 inches below the top of the planned pavers. Once leveled, a vibratory plate compactor is used to achieve maximum density. This process ensures a firm, stable foundation for the pavers and prevents settling. Compaction is critical to lock the fines into the larger aggregate, providing excellent drainage and load-bearing capacity.
Goal: New Class 5 limestone aggregate is imported, spread, and compacted to form a stable base for the paver parking pad, ensuring proper drainage and density.
Tools and materials
- Hydraulic Hoses and Couplers
- Measuring Tape
- Rakes
- Skid Steer Loader
- String Line and Stakes
- Vibratory Plate Compactor
- Class 5 Limestone Aggregate
What they say