Install First Course of Dry-Stacked Stones
At 2:43 in
Building a flagstone wall and prepping for pavers day1
What happens here
The first course of flagstones for the retaining wall is laid directly on the excavated, compacted base. The base material used is recycled Class 5, a mixture of asphalt and concrete ground down to a fine powder, which acts as a strong binding agent when compacted. The largest and heaviest flagstones are chosen for the bottom course to provide maximum stability. The natural, irregular shapes of the stones require careful selection and placement, similar to assembling a jigsaw puzzle, to achieve a tight fit without traditional mortar. Smaller pieces are used to fill gaps and stabilize larger stones. This method relies on the weight and interlocking nature of the stones, combined with the binding properties of the compacted base, for structural integrity.
Goal: Large flagstones are carefully selected and dry-stacked to form the first course of the retaining wall, leveraging the compacted recycled aggregate as a binding base.
Tools and materials
- Flagstones
- Rubber Mallet/Hammer
- Shovels/Trowels
- Work Gloves
- Recycled Class 5 Aggregate
What they say
(2,195 characters)Hide
What they say
(2,195 characters)Auto-generated from the video audio.