Rough Cut Excavation for Parking Pad

6:59
18:39
79.2K views

At 6:59 in

Building a flagstone wall and prepping for pavers day1

What happens here

The old driveway area, which will become a new paver parking pad, undergoes initial excavation. A skid steer loader is used for this rough cut to quickly remove the bulk of the old driveway material. The elevation for this area is critical, as it needs to match the existing driveway at one end and the new retaining wall at the other, with a specific pitch for drainage. String lines are set up to provide a visual guide for the desired depth and slope, which will ultimately determine the sub-base and paver layers. The precise final sub-cut will be done with a mini excavator to avoid over-disturbing the underlying material, crucial for stability.

Goal: The main portion of the old driveway is roughly excavated with a skid steer, preparing the area for the paver parking pad. String lines are set to guide the precise sub-cut depth.

Tools and materials

  • Measuring Tape
  • Skid Steer Loader
  • String Line and Stakes

What they say

Hide

how long did that take like two hours yeah two hours the next step is to excavate for the parking pad but there's a fairly substantial challenge that they've still yet to overcome going on it's where we have to excavate down to is really gonna undermine the corner of this slab and really undermined this busted wall that they got so what we're gonna do so we're gonna have to build a small wall along here to hold all that earthbag and not undermining everything more than the first step will be to shaved the old driveway material off using the cat skid loader but when it comes to making the final sub cut we're going to switch and use the mini excavator simply because we don't want to drive on that sub base material any more than we have to because every time we put tracks on it we risk loosening it up so after we get the old material shaved off we'll make the final cut with the Mini X you'll see that in a minute [Music] drinking coffee oh geez I [Music] this parking pad we is not going to be flat it's actually going to have an angle throughout the entire thing to match up with the pitch that's going from the existing driveway up to the retaining wall so a string line is set up to make sure that we keep a consistent depth for our base material our sand and our pavers which ultimately will get laid [Music] so as Blaine is excavating down Sam simply measures from the string line down to the sub cut on top of that goes the base material on top of that goes the sand and then on top of that goes the pavers so he wants to make sure that the sub cut is right in the first place but before they get too far into the date they've still got a tricky corner they got to figure out here it's busy fishing down so we're gonna be below they can still do a little bit more of the excavation with the equipment before they've got to switch over and make a different plan