Retaining Wall Base Construction with Geogrid
At 3:08 in
We hit a Buried Line -on the Last job of the season.
What happens here
After the excavation is complete and the pipe repair is made, a stable and permeable base is established for the new retaining wall. A thick layer of crushed rock (specifically Class 5 aggregate), approximately 1 foot deep, is spread across the bottom of the excavated area. This layer is then thoroughly compacted using a plate compactor to create a solid foundation and ensure excellent drainage. The first courses of interlocking concrete retaining wall blocks (solid Versa-Lok type) are meticulously laid. Geogrid reinforcement is strategically placed between selected layers of the blocks and extended into the backfill area, providing crucial structural integrity against lateral soil pressure.
Goal: A stable, well-drained base is created using compacted crushed rock, and the initial layers of interlocking concrete blocks are installed with geogrid for reinforcement.
Tools and materials
- Concrete Saw (e.g
- Husqvarna)
- Crushed Rock (Class 5 Aggregate)
- Geogrid
- Level
- Plate Compactor
- Shovels/Rakes