Skip to main content

Retaining Wall Base Construction with Geogrid

3:08
24:25
113K views

At 3:08 in

We hit a Buried Line -on the Last job of the season.

What happens here

After the excavation is complete and the pipe repair is made, a stable and permeable base is established for the new retaining wall. A thick layer of crushed rock (specifically Class 5 aggregate), approximately 1 foot deep, is spread across the bottom of the excavated area. This layer is then thoroughly compacted using a plate compactor to create a solid foundation and ensure excellent drainage. The first courses of interlocking concrete retaining wall blocks (solid Versa-Lok type) are meticulously laid. Geogrid reinforcement is strategically placed between selected layers of the blocks and extended into the backfill area, providing crucial structural integrity against lateral soil pressure.

Goal: A stable, well-drained base is created using compacted crushed rock, and the initial layers of interlocking concrete blocks are installed with geogrid for reinforcement.

Tools and materials

  • Concrete Saw (e.g
  • Husqvarna)
  • Crushed Rock (Class 5 Aggregate)
  • Geogrid
  • Level
  • Plate Compactor
  • Shovels/Rakes

What they say

Hide

basically means that it's a private line the public utilities don't have to mark private lines they're not responsible for that this was a private unmarked line and so then we have to start to play sherlock holmes and figure out whose line it is now in this case we're going to put it back together and we track down that this is actually an irrigation line so then we called out the irrigation contractor responsible on the site to make sure that he was good with the way we repaired this now if this was a cable line or a private electrical line something that we're really not comfortable doing that's when we would call out a contractor to fix it so here's how i look at it if i've

Auto-generated from the video audio.