Prepare Foundation with Rock Base
At 8:02 in
We hit a Buried Line -on the Last job of the season.
What happens here
The excavation is prepared for the new window well by laying down a 'thickened base' of Class 5 aggregate rock. An initial foot of rock is laid and compacted with a plate compactor (Wacker Neuson). The crew explicitly states adding more rock than the minimum 12 inches recommended by the engineer, opting for a 'beefier' base. This over-engineering with additional rock layers serves as 'cheap insurance' against hydrostatic pressure and is key to creating a porous, free-draining environment around the structure. Geogrid material is also laid out on top of the soil layers to prevent future shifting.
Goal: A thick, stable base is created using Class 5 aggregate rock to provide robust support and drainage for the new window well. This base is compacted thoroughly using a plate compactor. Additional layers of rock are added beyond engineering minimums to enhance stability and hydrostatic pressure relief.
Tools and materials
- Class 5 Aggregate Rock
- Geogrid Material
- Plate Compactor (Wacker Neuson)
- Plywood/Ramp
- Shovels/Rakes
- Skid Steer (Caterpillar)