Final Grading and Site Restoration
At 17:43 in
We hit a Buried Line -on the Last job of the season.
What happens here
With the retaining wall fully constructed and capped, the final stage involves restoring the surrounding landscape. High-quality, imported soil is used for backfilling the remaining excavated areas, as the original soil was deemed unsuitable due to debris and poor compaction. A skid steer efficiently moves and spreads the soil, followed by manual labor with shovels and rakes for fine grading. The landscape is meticulously sloped away from the building's foundation and the new window well to ensure that all surface water runoff is directed outwards, preventing future water accumulation and protecting the foundation and drain system from damage.
Goal: The site is restored by backfilling with fresh soil and grading the landscape to ensure all water runoff is directed away from the building and the new window well.
Tools and materials
- Imported Soil
- Level
- Shovels/Rakes
- Skid Steer
What they say
(1,123 characters)Hide
What they say
(1,123 characters)Auto-generated from the video audio.