Assess Site and Excavate Old Window Well
At 0:16 in
We hit a Buried Line -on the Last job of the season.
What happens here
The project starts with an initial assessment of the existing window well, which is noted to be failing, with its base not properly buried and the walls bowing inward. This failure is attributed to poor soil conditions, specifically 'city backfill' with garbage and inadequate compaction. Large-scale excavation is performed using an excavator (Daewoo 75V) to remove the failing structure and prepare the area for new construction. Safety precautions include noting existing utility lines (public and private).
Goal: Begin by assessing the job site, specifically identifying the failing window well and unstable soil conditions. The old window well, which had a base improperly buried and was bowing inwards, is excavated and removed. Note the presence of typical 'city backfill' soil containing mixed debris, indicating poor original compaction.
Tools and materials
- Dump Truck/Trailer
- Excavator (Daewoo 75V)
- Grapple Attachment
- Safety Tape
- Spike/Probe
- Utility Locate Service
What they say
(1,059 characters)Hide
What they say
(1,059 characters)Auto-generated from the video audio.