Install Final Capstones and Clean-up
At 18:29 in
We hit a Buried Line -on the Last job of the season.
What happens here
The top course of capstones for the retaining wall is installed, secured with concrete adhesive (Sikaflex Construction Sealant) using a battery-powered caulking gun (Milwaukee M12 FUEL). This provides a clean, finished appearance and further solidifies the wall structure. The entire work area is tidied, and a final inspection of the completed window well and surrounding landscape is conducted to ensure proper grading and functionality.
Goal: The final capstones are installed on top of the retaining wall, secured with concrete adhesive to provide a finished look and additional stability. The site is then cleaned, and the finished window well is inspected, ensuring all work meets quality and aesthetic standards.
Tools and materials
- Broom/Leaf Blower (Milwaukee M18 FUEL)
- Capstones
- Caulking Gun (Milwaukee M12 FUEL)
- Marking Pen
What they say
(684 characters)Hide
What they say
(684 characters)Auto-generated from the video audio.