Install Final Capstones and Clean-up

18:29
24:25
113K views

At 18:29 in

We hit a Buried Line -on the Last job of the season.

What happens here

The top course of capstones for the retaining wall is installed, secured with concrete adhesive (Sikaflex Construction Sealant) using a battery-powered caulking gun (Milwaukee M12 FUEL). This provides a clean, finished appearance and further solidifies the wall structure. The entire work area is tidied, and a final inspection of the completed window well and surrounding landscape is conducted to ensure proper grading and functionality.

Goal: The final capstones are installed on top of the retaining wall, secured with concrete adhesive to provide a finished look and additional stability. The site is then cleaned, and the finished window well is inspected, ensuring all work meets quality and aesthetic standards.

Tools and materials

  • Broom/Leaf Blower (Milwaukee M18 FUEL)
  • Capstones
  • Caulking Gun (Milwaukee M12 FUEL)
  • Marking Pen

What they say

Hide

towards the parking lot see no gaps on that top cap so here's what we got if you guys will remember this window well was absolutely failing the the sides were all tipping in and we dug down deeper than we would normally excavate for the base we went extra on the rock and we did a geo grid bridge everything graded away from the building management companies still kind of trying to figure out what they want to do with this it sounds like we will be back doing putting in some edging and some more rocks and then we'll take a look at how this turned out yeah last one of the season it went real well then i'm gonna clean the dust off the sides there i just haven't gotten a chance to

Auto-generated from the video audio.