Backfill and Grade Around Structure
At 13:00 in
We hit a Buried Line -on the Last job of the season.
What happens here
The area surrounding the window well is backfilled with clean, imported soil (not the original excavated soil). Layers of soil are placed and compacted against the reinforced wall and geogrid. The final grading ensures that the ground slopes away from the building, directing surface water runoff towards the parking lot and preventing water from pooling against the foundation. This entire process supports the drain pipe alignment by creating a stable, well-drained environment.
Goal: The area around the newly constructed window well is meticulously backfilled and graded. Imported, clean soil is used instead of the excavated 'garbage' fill. Layers of rock and soil are compacted, and the grade is sloped away from the building to direct water flow, preventing accumulation and further hydrostatic pressure.
Tools and materials
- Excavator
- Imported Clean Soil
- Plate Compactor
- Ramp/Plywood
- Shovels/Rakes
- Skid Steer (Caterpillar)
What they say
(2,091 characters)Hide
What they say
(2,091 characters)Auto-generated from the video audio.