What happens here

The area surrounding the window well is backfilled with clean, imported soil (not the original excavated soil). Layers of soil are placed and compacted against the reinforced wall and geogrid. The final grading ensures that the ground slopes away from the building, directing surface water runoff towards the parking lot and preventing water from pooling against the foundation. This entire process supports the drain pipe alignment by creating a stable, well-drained environment.

Goal: The area around the newly constructed window well is meticulously backfilled and graded. Imported, clean soil is used instead of the excavated 'garbage' fill. Layers of rock and soil are compacted, and the grade is sloped away from the building to direct water flow, preventing accumulation and further hydrostatic pressure.

Tools and materials

  • Excavator
  • Imported Clean Soil
  • Plate Compactor
  • Ramp/Plywood
  • Shovels/Rakes
  • Skid Steer (Caterpillar)

What they say

Hide

building and backfilling so when we build these walls we can go we can dry stack up to two feet we can put yeah four blocks up and then flip the grid over and then place our rock in place and then backfill the compass and compact you know all the way up and then just dry stack and that way we can get a tighter sequencing on our jobs don't stand there if they have boom see once you start using the cmp grapple you just i i don't even know how i mean yes guys be like the tilt rotator can do this that and the other thing and yeah they can i just like this i prefer this i don't think this debuts gonna have this ever off from it i mean we'd have to be doing just stupidly big excavating job and then we just get a bigger excavator to do that yeah i don't think that's ever going to come off now that i think about it guys watch this in 4k and on a big screen and hey if you like videos like this could you hit that thumbs up button it goes a long long way and it's super appreciated and maybe leave a comment down below [Music] so next step is we're going to stack two more courses then it's going to be a grid layer and then we're going to stack the course on top of that and get that all back filled at chunk of pvc but we hit last week we got patched up it ended up it was a sprinkler main for the sprinkler system so we patched it the sprinkler guys came out just to make sure everything was all good so that's all good to go we're going to get packed up underneath it and then fill up over the top [Music] corner [Music] still but we're done with the build we need to excavate this out a little bit more we need about another foot to get the grid to lay flat and now we're just going to focus on backfilling all this today and then i'm going to glue the caps tomorrow because it's going to be like 20 degrees warmer and uh yeah that's where we're at we gotta regrade here we're gonna put a little bit of a slope on it to get the water going away from the building uh we have to finish kind of backfilling and grading this area out to get the water running away towards the parking lot