Skip to main content

Prepare Work Area and Shut Off Water

0:15
13:59
3.9K views

At 0:15 in

Installing Water Shut Off Valves On Copper Pipe

What happens here

Before beginning any plumbing work, it is critical to turn off the main water supply to prevent flooding. Once the water is off, carefully remove the existing plastic escutcheon plates from around the copper stub-out pipes. These plates are typically decorative and can be popped off by hand. The presenter advises against leaving plastic escutcheons on during soldering to avoid melting them. He then explains the goal is to cut the copper pipes and solder on male threaded adapters, leaving enough pipe length for future repairs if needed. Place a catch basin, like a pie tin, under the work area to collect any residual water that may drain from the pipes after they are cut.

Goal: Ensure safety and accessibility by shutting off water and clearing the work area.

Tools and materials

  • Catch Basin — Collecting residual water from the pipes after cutting
  • Plastic Escutcheon Plates — Covering the pipe openings in the wall; removed for this project