Skip to main content

Final Inspection and Water Turn-On

12:35
13:59
3.9K views

At 12:35 in

Installing Water Shut Off Valves On Copper Pipe

What happens here

With all components securely installed, slowly turn the main water supply back on. Carefully check all new connections for any signs of leaks. Once confirmed leak-free, the plumbing work is complete. The presenter concludes by emphasizing the benefits of this method, particularly for its clean appearance and the functionality of the dual-stop valve.

Goal: Verify leak-free operation and complete the project.