Preparing the Foundation Course
3:39
16:47
61.4K views
At 3:39 in
Did we STOP losing money yet?!? 2/4
What happens here
The foundation course of Versa-Lok Standard interlocking blocks is carefully placed on a prepared gravel base. A Milwaukee M18 caulking gun is used to apply a generous amount of concrete adhesive (e.g., Versabond Concrete Adhesive) to the top surface of the blocks before placing the next layer, particularly in corner sections. This is crucial for stability as pins cannot always be used in corners to align blocks. The blocks are tapped into place with a rubber mallet and leveled to ensure a perfect base for the wall.
Goal: The first course of Versa-Lok Standard blocks is laid on a gravel base, using concrete adhesive for secure placement, especially in corners.
Tools and materials
- Milwaukee M18 Caulking Gun Milwaukee
- Rakes
- Rubber Mallet
- Safety Glasses
- Shovels
- Spirit Level
- Work Gloves
- Concrete Adhesive (e.g
- Versabond) Versabond
What they say
(968 characters)Hide
What they say
(968 characters)Auto-generated from the video audio.