Demolishing Upper Timber Wall for Geo-grid Extension
At 5:16 in
Did we STOP losing money yet?!? 2/4
What happens here
The initial plan to leave part of the old timber wall in place is modified. The remaining upper sections of the timber wall are demolished using the excavator with a grapple. This decision is made to allow for a full 6-foot extension of the geo-grid into the backfill, ensuring adequate stabilization for the new wall. The foreman explains that while buried timber typically doesn't rot if encapsulated in compacted soil (lacking moisture, air, and sunlight), removing it is necessary here to meet the enhanced geo-grid requirements.
Goal: Due to updated stability requirements, the remaining upper portion of the old timber wall is removed to allow for a full 6-foot geo-grid extension into the backfill.
Tools and materials
- Daewoo 75V Excavator Daewoo
- Excavator Grapple Attachment
What they say
(1,256 characters)Hide
What they say
(1,256 characters)Auto-generated from the video audio.