What happens here

After the foundation course, additional layers of Versa-Lok blocks are stacked. Geo-grid material is laid over the blocks at specific intervals (typically every two feet of height) and extended horizontally into the backfill area. The geo-grid is placed on top of a course of blocks, then the next course is laid on top of the geo-grid, securing it. The grid is then pulled taut and extended into the area behind the wall where backfill will be placed. This creates internal reinforcement for the retaining wall, preventing soil movement and increasing overall structural integrity.

Goal: Subsequent courses of interlocking blocks are laid, with geo-grid layered periodically and extended into the backfill for enhanced stability.

Tools and materials

  • Geo-grid Fabric
  • Rubber Mallet
  • Spirit Level
  • Concrete Adhesive Versabond

What they say

Hide

[Music] quite a pretty good day today again we got a lot a lot done god site's so muddy you can hear it squish so plan for tomorrow first thing the rest of this upper wall is coming out we need to be six feet back from the front of our blocks for the geo grid we're at like four right now so we got two more feet to go that's gotta come down