Building Wall Courses and Integrating Geo-grid
At 4:49 in
Did we STOP losing money yet?!? 2/4
What happens here
After the foundation course, additional layers of Versa-Lok blocks are stacked. Geo-grid material is laid over the blocks at specific intervals (typically every two feet of height) and extended horizontally into the backfill area. The geo-grid is placed on top of a course of blocks, then the next course is laid on top of the geo-grid, securing it. The grid is then pulled taut and extended into the area behind the wall where backfill will be placed. This creates internal reinforcement for the retaining wall, preventing soil movement and increasing overall structural integrity.
Goal: Subsequent courses of interlocking blocks are laid, with geo-grid layered periodically and extended into the backfill for enhanced stability.
Tools and materials
- Geo-grid Fabric
- Rubber Mallet
- Spirit Level
- Concrete Adhesive Versabond
What they say
(341 characters)Hide
What they say
(341 characters)Auto-generated from the video audio.