Skip to main content

Demolition of Existing Timber Retaining Wall

1:03
16:47
61.4K views

At 1:03 in

Did we STOP losing money yet?!? 2/4

What happens here

The excavator's grapple is used to carefully pull out sections of the old timber retaining wall. The demolition is performed incrementally, rather than removing the entire wall at once, to maintain site stability and manage debris. For hard-to-reach or stubbornly embedded sections, a reciprocating saw (Milwaukee Sawzall) is used by hand to cut through the timbers. The strategy is to remove only enough material to allow for the construction of the new wall, using the old soil for backfill where possible.

Goal: Sections of an old timber retaining wall are strategically removed using an excavator and reciprocating saw to prepare for the new interlocking block wall.

Tools and materials

  • Daewoo 75V Excavator
  • Excavator Grapple Attachment
  • Hearing Protection
  • Safety Glasses
  • Work Gloves

What they say

Hide

freeze fall state [Music] foreign so we're not tearing out the entire retaining wall from start to finish because we don't want to basically hog up the entire parking lot to do that so we're going to leave some of it in place while we build and then we're going to take out just enough that we can build it back up and then use that material to backfill the other portion of the retaining wall so it's kind of like we're flipping the soil from one side of the site to the other side of the site but when it gets really bad like this stuff we have to haul it out

Auto-generated from the video audio.