Installing Pins and Backfilling with Aggregate
At 11:47 in
Did we STOP losing money yet?!? 2/4
What happens here
Small, solid pins are inserted into pre-drilled holes in the Versa-Lok blocks. These pins engage with slots in the block course below, ensuring proper alignment and setback. After placing a course of blocks and pins, the skid steer or excavator carefully dumps drainage aggregate directly behind the newly laid blocks. This aggregate is then raked level by hand. The narrator explains the process of building in two-foot lifts: laying blocks, flipping up the geo-grid, adding and compacting a foot of dirt, and then rolling the geo-grid back down for the next layer. This iterative process builds a strong and stable wall.
Goal: Pins are inserted into standard blocks for alignment, and aggregate is poured behind the blocks before being leveled and compacted.
Tools and materials
- Geo-grid Fabric
- Plate Compactor
- Rake
- Versa-Lok Pins Versa-Lok
- Volvo MC115C Skid Steer Volvo
- Drainage Aggregate (Rock) Unspecified