The crew encounters significant water pooling in the excavated foundation trench, indicating an underground water issue. To address this, they consult with an engineer and decide to excavate the foundation an additional 3 feet deep. This extended depth will allow for a much heavier and wider gravel base, providing a larger reservoir for water to collect and drain away, preventing pressure buildup behind the wall. This also requires cutting out a larger 'pyramid' section of the adjacent parking lot to accommodate the increased base width (a 1:1 ratio of depth to width).

Goal: Mitigate water pooling in the foundation trench and ensure long-term wall stability by deepening the base and improving drainage.

Tools and materials

  • Daewoo Excavator
  • Volvo Skid Steer
  • Water Pump
  • Gravel

What they say

Hide

the ground and with rain snow rain snow we don't want any dimples in the ground so it leaves little literally dimples in the ground and we don't want that so you'll see us flat packing or sheen packing it with the smaller packer all right uh you guys are gonna have to excuse my french on this but today just went here's what's going on so this is this is gonna be our outside 90 right here and then the wall is going to start swinging out that way the first scoop or second scoop we took with the excavator through here water to start pouring in that's four inches of water sitting there where our bases are supposed to be going which is like the last thing you want to see when you're trying to put in a base for a wall uh we're not 100 sure where it was coming in from it filled in so fast here's what we're going to do to alleviate these water problems we're having on our corner though so we heard back from the engineer and all he wants us to do is go down like three feet and just go extra heavy with the base so that the water has somewhere to go um and in order to do that obviously we have to excavate down three feet we just filled this in right now because there's a whole lot of kids running around this complex and tim didn't want any of them falling in there getting hurt but in order to get down that three feet there's a ratio so for every foot you go down you have to go a foot out so we have to cut a chunk pyramid of the parking lot out in order to get that room in front of where our wall is gonna be to do this correction so three feet down we need three feet in front uh we're gonna do that right away in the morning and then uh after that as long as nothing else goes wrong we are just gonna get in as much base as we can through here okay so it's not technically three feet in front it's a it's actually a pyramid so because the weight of the block doesn't go straight down it put it goes outward we've got to compensate and create that pyramid effect so as we go down we may have 12 inches in front 12 inches behind just depends on how much rock we put in also when we get into a soil correction situation like this we like to layer grid into the rock as well and i don't know if we've got that on film or not we've