Compacting Backfill and Installing Drainage
7:19
16:47
61.4K views
At 7:19 in
Did we STOP losing money yet?!? 2/4
What happens here
After laying each course of blocks and geo-grid, drainage aggregate (rock) is carefully placed behind the wall. This aggregate is spread and compacted in 1-foot lifts using a heavy-duty plate compactor (sheep's foot packer). The goal is to create a well-draining zone behind the wall, preventing hydrostatic pressure buildup. The foreman emphasizes the importance of ample drainage aggregate to ensure the drain tile itself doesn't have to work excessively, preventing water from getting 'stuck' in the soil zones.
Goal: Drainage aggregate is added behind the wall, and compacted in lifts with specialized equipment to ensure proper drainage and stability.
Tools and materials
- Rakes
- Sheep's Foot Packer (Heavy Compactor)
- Shovels
- Volvo MC115C Skid Steer Volvo
- Drainage Aggregate (Rock) Unspecified
What they say
(645 characters)Hide
What they say
(645 characters)Auto-generated from the video audio.