Compacting Backfill and Installing Drainage

7:19
16:47
61.4K views

At 7:19 in

Did we STOP losing money yet?!? 2/4

What happens here

After laying each course of blocks and geo-grid, drainage aggregate (rock) is carefully placed behind the wall. This aggregate is spread and compacted in 1-foot lifts using a heavy-duty plate compactor (sheep's foot packer). The goal is to create a well-draining zone behind the wall, preventing hydrostatic pressure buildup. The foreman emphasizes the importance of ample drainage aggregate to ensure the drain tile itself doesn't have to work excessively, preventing water from getting 'stuck' in the soil zones.

Goal: Drainage aggregate is added behind the wall, and compacted in lifts with specialized equipment to ensure proper drainage and stability.

Tools and materials

  • Rakes
  • Sheep's Foot Packer (Heavy Compactor)
  • Shovels
  • Volvo MC115C Skid Steer Volvo
  • Drainage Aggregate (Rock) Unspecified

What they say

Hide

and then we put the dirt up but we always keep that 12 inches exposed even though below it is almost two feet of rock and then it goes back down to 12 inches and then two feet that's how we build it in sections going up the more drainage aggregate you have the the less your your actual drain tile will work i started to explain this in the other video but here's a great example by over compensating on the drainage aggregate the entire wall now will weep there will be no water getting stuck in any one zone and therefore the drain tile should never actually function this is kind of a cool just top down that you see how we build these things