Construct Interlocking Block Wall Base
At 6:13 in
Did we STOP losing money yet?!? 2/4
What happens here
The base course of the interlocking block wall is laid on a prepared, leveled gravel bed. Concrete adhesive is applied generously between blocks, especially at corners where pins might not align perfectly. Workers place the Versa-Lok standard units, ensuring they are level and properly seated with a rubber mallet. Geogrid is rolled out and secured behind the blocks, extending back into the slope, and gravel is backfilled over it in 2-foot lifts. Each lift of gravel and soil is compacted using a plate compactor and a heavy sheepsfoot packer to ensure stability and proper drainage, literally sealing the soil to prevent water wicking into the wall.
Goal: Build the foundational courses of the interlocking block retaining wall with proper adhesion, leveling, geogrid, and compaction.
Tools and materials
- Caulk Gun (Milwaukee M18)
- Concrete Adhesive
- Geogrid
- Level
- Plate Compactor (Wacker)
- Rakes
- Rubber Mallet
- Sheepsfoot Packer (10
- 000 lb)
- Shovels
- Gravel
- Soil/Dirt
What they say