Material Segregation and Management

1:55
29:38
109K views

At 1:55 in

Building a Retaining wall start to finish #1

What happens here

During the excavation process, materials are carefully segregated into distinct piles. The ASV RT-75 skid steer is used to separate rocks and debris from viable soil. Rocks are stockpiled for potential reuse or proper disposal, while the 'good soil' is set aside to be repurposed as structural fill for the new retaining wall and grading. This practice minimizes waste and optimizes material use on-site.

Goal: Excavated materials are separated into different piles to manage their reuse or disposal efficiently, ensuring valuable soil is saved for structural fill.

Tools and materials

  • ASV RT-75 Compact Track Loader

What they say

Hide

wow let's go over here so we're tearing this all out this is all coming out i don't know if we'll get to that today that's most likely going to be tomorrow okay so we'll come straight across here the walls will 90 right there we're doing steps up in here yeah up to the top side of the wall right off the door okay that makes sense i think 11 steps it is or so what kind of steps are we putting in chilton steppers six inch children steppers are we not okay we're actually going to try to put them have you seen that picture of where they have the steppers going over the top of the block so you don't need to cap it no well we're going to try to do that with this so you give yourself an 18 inch footing step right on top of the block oh yeah yeah yeah yeah yeah yeah it's really nice looking it's a nice thing we actually did that in the training video we used the chilton steppers on top of the versalock so you're going to build a pyramid

Auto-generated from the video audio.