Material Segregation and Management
1:55
29:38
109K views
At 1:55 in
Building a Retaining wall start to finish #1
What happens here
During the excavation process, materials are carefully segregated into distinct piles. The ASV RT-75 skid steer is used to separate rocks and debris from viable soil. Rocks are stockpiled for potential reuse or proper disposal, while the 'good soil' is set aside to be repurposed as structural fill for the new retaining wall and grading. This practice minimizes waste and optimizes material use on-site.
Goal: Excavated materials are separated into different piles to manage their reuse or disposal efficiently, ensuring valuable soil is saved for structural fill.
Tools and materials
- ASV RT-75 Compact Track Loader
What they say
(942 characters)Hide
What they say
(942 characters)Auto-generated from the video audio.