Skip to main content

Capstone Installation and Final Grading

16:00
29:38
109K views

At 16:00 in

Building a Retaining wall start to finish #1

What happens here

The final stage of wall assembly involves installing capstones on the top course of the retaining wall (excluding areas where Chilton steppers are integrated for steps). These capstones are typically secured with high-strength concrete adhesive to prevent dislodgement and provide a finished, aesthetic top surface while protecting the underlying blocks. Once the capstones are in place, the entire area around the retaining wall and steps is finely graded. Topsoil is spread evenly, and the site is prepared for final landscaping elements, such as sod installation, planting, or seeding. All construction debris is removed, leaving a clean and aesthetically pleasing final product.

Goal: The retaining wall is finished by installing capstones and grading the surrounding area, completing both the structural and aesthetic aspects of the project.

Tools and materials

  • Grading Rakes/Shovels
  • Capstones Versa-Lok
  • Concrete Adhesive
  • Topsoil

What they say

Hide

loads of good fill soil so that he knew to tell those guys at the gate you know that it was like that but his logic was oh yeah it's 10.70 a yard but 40 dollars a ton and i was sitting there thinking 2 yards is 20 and that's way more than one ton for 40 dollars so i didn't understand his logic so him and i were arguing on the phone yelling and he was like well this is how we do it we've been in business for 20 years he actually ended up being a really nice guy you know okay his name was ben yeah and he was like we'll just take care of you guys for the day you've got more loads like this we want good clean fill but if you're just one truck pulling up you're gonna get charged the regular price [Music]

Auto-generated from the video audio.