The final stage of wall assembly involves installing capstones on the top course of the retaining wall (excluding areas where Chilton steppers are integrated for steps). These capstones are typically secured with high-strength concrete adhesive to prevent dislodgement and provide a finished, aesthetic top surface while protecting the underlying blocks. Once the capstones are in place, the entire area around the retaining wall and steps is finely graded. Topsoil is spread evenly, and the site is prepared for final landscaping elements, such as sod installation, planting, or seeding. All construction debris is removed, leaving a clean and aesthetically pleasing final product.
Goal: The retaining wall is finished by installing capstones and grading the surrounding area, completing both the structural and aesthetic aspects of the project.
Tools and materials
- Grading Rakes/Shovels
- Capstones Versa-Lok
- Concrete Adhesive
- Topsoil
What they say
(708 characters)Hide
What they say
(708 characters)Auto-generated from the video audio.