What happens here

The first course of Versa-Lok Standard interlocking blocks is the most critical step in retaining wall construction. Each block is carefully placed directly on the leveled and compacted gravel base. The blocks must be perfectly level both side-to-side and front-to-back, and aligned precisely according to the design plan. Any inaccuracies in this initial course will be magnified in subsequent layers, leading to an uneven or unstable wall. Tools like string lines, levels, and rubber mallets are used to achieve the necessary precision and ensure a solid foundation.

Goal: The first course of interlocking blocks is carefully laid and leveled on the prepared, compacted base, establishing the crucial foundation for the entire wall.

Tools and materials

  • Level
  • Rubber Mallet
  • String Line
  • Versa-Lok Standard Blocks Versa-Lok

What they say

Hide

up so he can even gain access over those high sides [Applause] watch the front tracks see that howdy good i'm stan i heard you're uh alex's friend yeah oh yeah is this your truck then can i ask you how much it costs ya around 250. 250. yeah so you're an independent trucker yep okay there's a lot of paving more of the dirt do you work i used to be an independent trucker i used to work for rocky and a couple of the other banners a couple of the other big-time companies so who do you well we go through a broker yeah which broker ah tonka tonka okay that must be a new one because i went through jacobs those were brokers that i went through those guys are probably all dead by now though i i guess i'm more we're more on the asphalt side so we do a lot of paving like with roadways and stuff like that and do you get paid by the time for