Skip to main content

Laying Subsequent Block Courses

11:50
29:38
109K views

At 11:50 in

Building a Retaining wall start to finish #1

What happens here

Once the first course and geogrid are in place, subsequent courses of Versa-Lok Standard blocks are laid. Each new block is offset (staggered) relative to the blocks in the course below, creating an interlocking pattern that distributes load and enhances stability. Connecting pins are inserted through pre-drilled holes in the blocks to mechanically link each course to the one beneath it. These pins are crucial for maintaining the wall's integrity and consistent batter (slope). The blocks are continuously checked for level and alignment as the wall rises.

Goal: Additional courses of interlocking blocks are systematically laid, staggered over the previous layers, and secured with pins to build up the wall's height and strength.

Tools and materials

  • Level
  • Rubber Mallet
  • Connecting Pins Versa-Lok
  • Versa-Lok Standard Blocks Versa-Lok

What they say

Hide

hours and short nights yes because uh your profits are made by how good you turn a wrench and how well you keep these up freaking everything kills you on these dump trucks man oh yeah good deal no rust yep can't believe you're letting your buddy load you like that he's having a heck of a time getting that bucket to empty with that clay what do you say it's wisconsin spec what's the difference in the specs i think 73 000 pounds but in minnesota everything's heavier duty to handle more weight okay can we go look at it yeah [Music]

Auto-generated from the video audio.