Base Excavation and Fine Grading

4:35
29:38
109K views

At 4:35 in

Building a Retaining wall start to finish #1

What happens here

After the bulk of the demolition and excavation, the crew uses an excavator and manual tools to carefully dig the trench for the retaining wall's foundation. This involves precise measurements to ensure the correct depth, which must be below the local frost line (often 4 feet in cold climates like Minnesota) if the wall is physically connected to a structure. The base of the trench is then fine-graded to achieve a perfectly level surface. This meticulous preparation is crucial for the stability and longevity of the retaining wall, as any unevenness in the base can lead to future settlement or failure.

Goal: The base for the new retaining wall is meticulously excavated and fine-graded to achieve the precise depth and level required for the foundation.

Tools and materials

  • Bobcat E26 Mini Excavator
  • Level
  • Measuring Tape
  • Shovels

What they say

Hide

big old red our dump truck is having some technical difficulties and is in the shop so we found and hired a quad axle dump truck that has a much higher sides than our dump truck so to get up and into that truck without scratching or scraping it we're building an access ramp [Music] he lifts the bucket up so he can see underneath it so he can pressure compact the ramp we want to make sure that that ramp is as sturdy as possible before the truck shows up so that way we have no surprises when we're trying to load material into the side of a new dump truck