Building a Retaining wall start to finish #1
Video by Stanley "Dirt Monkey" Genadek
Stanley "Dirt Monkey" Genadek
What happens here
This project provides a comprehensive guide on building a robust retaining wall using interlocking blocks, including the integration of steps. The process covers initial site excavation, proper base preparation, drainage installation, laying multiple courses of blocks with geogrid reinforcement, and constructing aesthetically pleasing integrated steps.
Transcript
(13,675 characters)Hide
Transcript
(13,675 characters)all right you guys in the next two-part video series on retaining walls we're going to show you how we built this retaining wall incorporating a set of steps into it from start to finish but i think we're getting a little bit ahead of the game let's back this video up and begin it right from where everything started right now good morning you guys well it's the start of a brand new job and a brand new video let's find out what we've got going on here today we'll hop in the hop over and talk to alex here real quick and see what we've got going on hope the sprinkler system has been deactivated you're good alex go ahead [Applause] oh yeah i can see the red line painted here [Music] all right [Applause] you guys know alex like i know alex he's not gonna stop working unless you make them so let's make them well can you kind of walk us through what's what's happening on this job site yeah so we're basically cutting this bank out here this is essentially going to be the front of the wall it's going to kind of curve around over there and then end we've got a 15 foot easement from the road there and it's going to come straight along there it's going to 90 from that where that existing wow let's go over here so we're tearing this all out this is all coming out i don't know if we'll get to that today that's most likely going to be tomorrow okay so we'll come straight across here the walls will 90 right there we're doing steps up in here yeah up to the top side of the wall right off the door okay that makes sense i think 11 steps it is or so what kind of steps are we putting in chilton steppers six inch children steppers are we not okay we're actually going to try to put them have you seen that picture of where they have the steppers going over the top of the block so you don't need to cap it no well we're going to try to do that with this so you give yourself an 18 inch footing step right on top of the block oh yeah yeah yeah yeah yeah yeah it's really nice looking it's a nice thing we actually did that in the training video we used the chilton steppers on top of the versalock so you're going to build a pyramid and we're widening this driveway out as well right yeah about 15 feet yeah i think he's gonna come in here and have a whole new driveway put in paved right up dude that's almost like a double driveway then because you're gonna take all this out so you're hauling out you're hauling out a lot of dirt yeah i mean it's gonna come straight across you can see roughly our paint line there it's not perfect but it's gonna come straight into there yeah so this is all gonna be out of here it's gonna be a nice big open area for the customer here so you're knocking down these trees and taking out the timber walls and excavating back so you can put grid in because we got looks like we got a six foot tall wall five foot yeah five foot okay fully engineered yeah fully engineered two layers of grid going in okay makes total sense yeah well that's today's fun well all right i'm not gonna slow you down so he's separating the materials right now so he's got a big scoop of rock we'll see where he pops that so this the rock will go over here so the good soil will get used as structural fill someplace and this gets disposed of so we don't even waste soil we recycle a lot of materials but let's pop you on the top big old red our dump truck is having some technical difficulties and is in the shop so we found and hired a quad axle dump truck that has a much higher sides than our dump truck so to get up and into that truck without scratching or scraping it we're building an access ramp [Music] he lifts the bucket up so he can see underneath it so he can pressure compact the ramp we want to make sure that that ramp is as sturdy as possible before the truck shows up so that way we have no surprises when we're trying to load material into the side of a new dump truck the truck that's going to show up is what we call a wisconsin truck i'm air quoting right now heavier duty higher sides designed to handle more material making it more difficult to gain access to [Music] so to gain access to this truck alex had to actually build a ramp that's a 100 i'm going to guess 180 000 truck let's just watch what he has to do to load he's going to go heavy toward the back of himself so as he's going in he doesn't want to scratch up his buddy's truck and that is like his friend right there he's got to be super careful let's watch him do another one here real quick so you can see he's got the ramp built up so he can even gain access over those high sides [Applause] watch the front tracks see that howdy good i'm stan i heard you're uh alex's friend yeah oh yeah is this your truck then can i ask you how much it costs ya around 250. 250. yeah so you're an independent trucker yep okay there's a lot of paving more of the dirt do you work i used to be an independent trucker i used to work for rocky and a couple of the other banners a couple of the other big-time companies so who do you well we go through a broker yeah which broker ah tonka tonka okay that must be a new one because i went through jacobs those were brokers that i went through those guys are probably all dead by now though i i guess i'm more we're more on the asphalt side so we do a lot of paving like with roadways and stuff like that and do you get paid by the time for asphalt then uh no it's all hourly oh hourly okay because some of the some of the brokerage companies like we work for i would work for gravel pits and things like that and sometimes i get paid by the time and when we had steel boxes a steel box guys got paid a lot less than the aluminum box guys yeah everything's now just all hourly so oh really what year is this one uh 2021 bought it new last year what'd you do before uh cars so how did you find out about trucking and being an independent trucker my my girlfriend's uh dad used to have the oranges they sold out years back and then we just kind of restarted the uh how many trucks you got just this one for now are you planning on expanding the fleet eventually trucking it's uh you better you better love your tools and you better love long hours and short nights yes because uh your profits are made by how good you turn a wrench and how well you keep these up freaking everything kills you on these dump trucks man oh yeah good deal no rust yep can't believe you're letting your buddy load you like that he's having a heck of a time getting that bucket to empty with that clay what do you say it's wisconsin spec what's the difference in the specs i think 73 000 pounds but in minnesota everything's heavier duty to handle more weight okay can we go look at it yeah [Music] you know what they say about detroit right if they're not leaking oil it's because they're out of oil and there's nothing wrong with it because it's a visual indicator yeah i'm good on oil it's just laying underneath the truck yeah your destroyer but not why not cat was that not an option no they the cat's making uh their big truck motors when death came around is deutsch even an option on trucks like this i don't think so okay so joyce is more for loaders and stuff like that okay makes sense yeah you can tell you you hauled a mix that's after i cleaned it well all right thanks for the i'm gonna you mind if i take a peek inside i don't think any of us care they've seen the inside of my truck look at that we got a box camera up here there's a kia there's a box camera oh look at alex is loading them all heavy to the passenger side or yeah passenger side pretty nice man pretty nice that's what you expect for a 250 000 kenworth they told us it was going to be ten dollars a yard yeah we brought in about 15 yards or 17 times maybe 14 whatever it is and then he went there and he called me like is that the right price 300 they charge us for 25 yards because it was the volume of the box not the actual amount of dirt inside of there because they consider it construction debris you know not actual soil and i was supposed to call down there beforehand and set up you know five six loads of good fill soil so that he knew to tell those guys at the gate you know that it was like that but his logic was oh yeah it's 10.70 a yard but 40 dollars a ton and i was sitting there thinking 2 yards is 20 and that's way more than one ton for 40 dollars so i didn't understand his logic so him and i were arguing on the phone yelling and he was like well this is how we do it we've been in business for 20 years he actually ended up being a really nice guy you know okay his name was ben yeah and he was like we'll just take care of you guys for the day you've got more loads like this we want good clean fill but if you're just one truck pulling up you're gonna get charged the regular price [Music] all right we got it all prepped up for rain here got the bank all carved out all the soil hauled out today and uh just prepped for the rain now a little bit of rain about an inch i can't catch a break out here get the step put in right there and this stuff will just up into the hill as the wall follows that way you don't have a front side wall and key that way [Applause] [Music] [Applause] [Music] well we always find something new on a job site so let's show them what we're dealing with we found a foundation that makes no sense there it is there two blocks off or block off so was it a cmu foundation yeah it's four feet down i mean it's a concrete base the same as the as a house right that makes no sense does it well i think it used to be like a little before they built that wooden retaining wall it could have been just a little so they either when they dug the foundation for the house they prepped that for a wall and changed their mind or they had that that half stub wall in there at some point and took it out to put the timbers in you know one of the things that happens when you physically connect anything to the structure then you are you have to bury it frost footings right that's why our retaining walls butt up to and touch but they never physically connect there's no physical connection method and in fact with these walls they tell you that they do not want them ever physically connected to a structure because they're designed to float you up independently why am i telling you because you know it all already it's like building a deck yeah yeah you gotta have footings that go down to hold the deck otherwise yeah right off your house and rip the ball down with it yeah yep at least here in minnesota now some of these guys watching you may be in arizona or california you're like what a frost footings what is that so a frost footing for us we have to actually bury the footing of of a house four feet below ground minimum in the twin cities when you go north you lit you got a place up north what is it up north isn't it 48 inches i don't order that slab up there oh or you could go a little counter or you can go slab on great an engineered slab on grade as well but for structures with basements you got to get below the frost line so you got a couple different options there but always something coming up so head scratcher yeah we just cut the block down to where we could get our base on top of it it's not gonna move it's four feet down so are you gonna put your block on this base on the top of this over the top but not directly physically yeah okay so you're gonna because that's that's tough like yeah be half on and half off so let's get it on where we're gonna have at least six inches of base rock so one of the guys i remember you being asked why don't we pour our um pads you know why don't we put our leveling pads underneath the retaining walls because then you lay it out but we have to be so micro precise when we're basing out a retaining wall and when you screed out that base because we can't use mortar the when you pour it out and screed it out it does not give you the same precision as being able to hand tailor each block and make sure that you're compensating because you know sometimes as well you know sometimes when we're doing the taller walls and we know we got eight layers of grit in we'll compensate by tipping that block that that that back back a little bit the batter back attitude because as you put the grid in it'll tend to kick it forward and then we'll modify it as we go down and shrink down to nothing we don't want it tipped that far back because there's no grid tipping it forward so well we really got to have better control than just pouring a base down and throwing block down and going we can't do it that way all right back to your regular schedule program [Music] my [Applause] so [Music] [Applause] [Music] [Applause] [Music] [Applause] [Music] [Applause] [Music] so [Music] [Applause] [Music] so [Music] all right so here's where we're at so far got about five steps in there that wall is almost at height there it's gonna be just maybe a little bit higher step up into the wall building it there we got our new guy art here he's uh giving us a hand today so all right you guys well that's gonna call it for this one but in the next video we're gonna show you how we wrap this wall up and we're going to do something a little bit different we're going to show you how we base the retaining wall in real time no cutting no editing we're going to put the camera down in front of blaine and we're going to show you exactly how he based out this section of the retaining wall so hopefully we'll see you guys on the next one god bless go get them hit that subscribe button and i hope you enjoyed today's adventure catch you on the next one you guys coming right down the pipeline
Auto-generated from the video audio.