Skip to main content

Compaction of Base and Subgrade

8:20
29:38
109K views

At 8:20 in

Building a Retaining wall start to finish #1

What happens here

After the drainage system is in place and covered with gravel, the entire base area is thoroughly compacted. A plate compactor is primarily used for this task. Compaction is performed in multiple passes to achieve optimal density of the granular material. This step is critical for preventing future settlement of the retaining wall, which could lead to structural issues and a compromised appearance. Proper compaction creates a stable and unyielding foundation that can support the weight of the blocks and the retained soil.

Goal: The entire foundation, including the gravel base and initial backfill layers, is compacted to ensure maximum density and prevent future settlement of the wall.

Tools and materials

  • Plate Compactor

What they say

Hide

heavier duty higher sides designed to handle more material making it more difficult to gain access to [Music] so to gain access to this truck alex had to actually build a ramp that's a 100 i'm going to guess 180 000 truck let's just watch what he has to do to load he's going to go heavy toward the back of himself so as he's going in he doesn't want to scratch up his buddy's truck and that is like his friend right there he's got to be super careful let's watch him do another one here real quick so you can see he's got the ramp built up so he can even gain access over those

Auto-generated from the video audio.