Skip to main content

Geogrid Reinforcement Installation

10:50
29:38
109K views

At 10:50 in

Building a Retaining wall start to finish #1

What happens here

Geogrid reinforcement is essential for taller retaining walls. After certain courses of blocks (typically every 2 feet of height, or as specified by engineering plans), sheets of geogrid are laid horizontally. The geogrid extends from the face of the wall, over the top of the blocks, and back into the retained soil. Backfill material is then placed on top of the geogrid and compacted. The friction between the geogrid and the soil creates a reinforced soil mass that helps to resist the lateral pressure from the retained earth, significantly increasing the wall's stability and preventing bulging or collapse. The video emphasizes a fully engineered wall with two layers of geogrid.

Goal: Geogrid is installed after specific courses of blocks, extending into the compacted backfill to provide critical structural stability and prevent wall failure.

Tools and materials

  • Cutting Tools
  • Geogrid

What they say

Hide

and do you get paid by the time for asphalt then uh no it's all hourly oh hourly okay because some of the some of the brokerage companies like we work for i would work for gravel pits and things like that and sometimes i get paid by the time and when we had steel boxes a steel box guys got paid a lot less than the aluminum box guys yeah everything's now just all hourly so oh really what year is this one uh 2021 bought it new last year what'd you do before uh cars so how did you find out about trucking and being an independent trucker my my girlfriend's uh dad used to have the oranges they sold out years back and then we just kind of restarted the uh how many trucks you got just this one for now are you planning on expanding the fleet eventually trucking it's uh you better you better love your tools and you better love long hours and short nights yes

Auto-generated from the video audio.