What happens here

The backfilling operation progresses as the compact track loader repeatedly transports fresh loads of dirt from the external stockpiles into the partially filled pool basin. The operator demonstrates precision by meticulously spreading the soil in even, controlled layers across the entire area. To achieve optimal stability and prevent future settling, the machine performs multiple passes over each newly spread layer, utilizing its weight and tracks for thorough compaction. This continuous process of filling, spreading, and compacting gradually raises the ground level until it reaches the desired final grade, seamlessly integrating the former pool area with the surrounding landscape.

Goal: Continuously transport and spread dirt with the skid steer to fill the pool, ensuring proper layering and compaction to achieve the final desired ground level.

Tools and materials

  • Bucket Attachment

What they say

Hide

that's where i think you're going to be [Music] i question everything especially from engineers and architects and people that have very specific skill sets that i can then borrow that knowledge from on potential future projects the this house that we put over this questionable soils is still there today and still has zero issues and one of the things i learned was about something and pumping when you're in less than favorable conditions but still using optimum soils let me kind of break this down having a little bit of deflection in that soil as long as it's a non-organic material can sometimes with caution and understanding be an okay thing

Auto-generated from the video audio.