Skip to main content

Consolidate Demolition Waste

2:35
16:52
92.2K views

At 2:35 in

Dissed by The Building Inspector! #fail

What happens here

Once various sections of the pool structure have been effectively removed, the compact track loader takes on the task of systematically gathering and consolidating all the large pieces of demolition debris. This includes insulation panels, broken concrete fragments, and torn sections of the pool walls. These materials are moved and accumulated into designated, organized piles situated outside the immediate pool basin. This process is vital for maintaining a clear and safe working area inside the pool for subsequent backfilling operations, and it also streamlines the eventual disposal of the waste materials.

Goal: Use the skid steer to gather and stack demolition debris from the pool, creating organized piles for eventual disposal and clearing the work zone.

Tools and materials

  • Grapple Attachment

What they say

Hide

hey two more right here too i think that's all of them so we'll be putting everything up here and then filling in the bottom and then doing the rest of the removals because we need a safe work zone the beak comes in amazingly handy we also made our own version of this called the monkey claw it's a much heavier duty version of this and it's more for massive demolition the beak which is uh not not saying it's light duty by any means it's just kind of like perfectly balanced for a skid loader and nice for a job like this i was just telling these guys about the monkey claw that's really for heavy heavy duty stuff the monkey claw's

Auto-generated from the video audio.