Begin Pool Backfill and Compaction

3:55
16:52
92.2K views

At 3:55 in

Dissed by The Building Inspector! #fail

What happens here

Following the removal of the majority of the pool's structural components, the compact track loader initiates the critical initial phase of backfilling the pool basin with excavated earth. The operator meticulously pushes and spreads uniform layers of dirt across the entire bottom of the pool. A key aspect of this step is the utilization of the skid steer's tracks; the machine makes multiple passes over the freshly spread soil layers to achieve preliminary compaction. This deliberate compaction is crucial for establishing a stable and solid base, which is essential to prevent future settling or instability once additional fill layers and surface treatments are applied.

Goal: Start refilling the pool excavation by pushing and spreading layers of dirt with the skid steer, using its tracks for initial compaction to create a stable base.

Tools and materials

  • Bucket Attachment

What they say

Hide

that's the that's the official name of it a buster crab swimming pool i didn't know that but some some old timer he was he was a olympic swimming pool champion he was telling me about all the different swimming pools buster crap that was the original version of it buster crab [Music]

Auto-generated from the video audio.