Demolition of Swimming Pool Components
At 0:32 in
Dissed by The Building Inspector! #fail
What happens here
A compact track loader (skid steer) is seen operating within the empty swimming pool, breaking up the existing 'gunite' bottom material. The operator starts the demolition process, with another worker assisting. The process involves removing everything from the pool structure except the bottom layer, which will be pulverized and used as backfill. This includes detaching and removing the pool's side walls, vinyl liner, and any internal support structures ('toads'). The bottom material, described as crumbly, turns into a powder-like consistency when dry.
Goal: Utilize a compact track loader to break up the bottom material of the swimming pool and remove initial layers of debris, such as side walls, vinyl liner, and support structures.
Tools and materials
- Compact Track Loader (Skid Steer) CAT
- Grapple Bucket
What they say
(584 characters)Hide
What they say
(584 characters)Auto-generated from the video audio.