Prepare the Foundation Trench

1:03
6:08
30.2K views

At 1:03 in

Chapter 1-the Start of a new wall

What happens here

The first critical step involves accurately marking the wall's layout to ensure proper alignment and dimensions. Following this, excavate a trench that is sufficiently wide and deep to accommodate the base course of blocks and the granular leveling pad. The trench must be excavated to a consistent depth along its entire length to establish a truly level base. After excavation, a layer of crushed gravel or road base material, typically 6-12 inches deep, is spread evenly within the trench. This granular material is then compacted using a plate compactor or hand tamper, and carefully leveled to create a precise, unyielding foundation for the first course of segmental retaining wall blocks. This initial leveling is paramount for the overall stability and appearance of the finished wall.

Goal: Begin by preparing the construction site, which includes marking out the retaining wall's path and excavating a level trench. This trench will serve as the crucial base for the entire wall structure. Once excavated, add and level a layer of crushed gravel or road base material within the trench to create a stable and well-draining foundation.

Tools and materials

  • Long Level
  • Mini Excavator (Bobcat 325)
  • Plate Compactor
  • Rakes
  • Shovels
  • Skid Steer (Caterpillar)
  • String Line
  • Tape Measure
  • Crushed Gravel / Road Base Generic