Install Drainage, Reinforcement, and Backfill
At 4:13 in
Chapter 1-the Start of a new wall
What happens here
Once the first course of blocks is successfully laid and leveled, the area behind the wall is backfilled. This involves adding more granular drainage material (like crushed stone) directly behind the blocks to provide stability and allow water to drain away from the wall's face. A mini excavator is used to efficiently move large quantities of earth and backfill material. The video also shows steel rebar cages being positioned horizontally behind the blocks, serving as a reinforcement system to enhance the wall's structural integrity and prepare for the installation of subsequent layers. This step ensures that the base layer is robustly supported and ready for the construction of the full wall height.
Goal: Backfill behind the first course with drainage material, install rebar reinforcement, and ensure the base is fully packed and ready for higher wall courses.
Tools and materials
- Mini Excavator
- Rakes
- Rebar Cages
- Shovels
- Granular Drainage Material
What they say
(640 characters)Hide
What they say
(640 characters)Auto-generated from the video audio.