What happens here

Starting from the lowest point of the wall, place the first locking blocks directly onto the meticulously leveled and compacted granular base. It is crucial that this initial course is installed perfectly level, both front-to-back and side-to-side, and accurately aligned with the string line. Use a rubber mallet to gently tap each block into its final position, ensuring it is firmly seated and has full contact with the base. Frequently check the level of each block and the overall course using a spirit level. Minor adjustments to the base can be made by adding or removing small amounts of gravel beneath the block. The precise placement and leveling of this first course are fundamental, as all subsequent courses will build upon it, directly impacting the integrity and appearance of the entire retaining wall.

Goal: Carefully place the first course of segmental retaining wall blocks directly on the prepared and compacted gravel base, ensuring each block is perfectly level and aligned with the established string line. Each block should be firmly seated and checked for levelness across its surface and with adjacent blocks.

Tools and materials

  • Rubber Mallet
  • Shovel / Trowel
  • Spirit Level (2-4 ft)
  • String Line
  • Tape Measure
  • Crushed Gravel / Road Base Generic

What they say

Hide

and then what kind of water then it was like why is everything so wet so the string is gonna be our back of black i'll make sure this one is buried that looks like it's going to be buried you know two and a half feet plus the camp is up here [Music] yeah that's a pretty that looks pretty good yeah i mean they were up yeah they they were pretty high up they had a ditch almost level there's a pretty good pretty good ditch going on behind here i like that elevation right there it's got a little tilt this way so when we bring it up and then have this grade come up it'll be about perfect sounds good [Music] you'll never see blaine or sam getting up to go get their own blocks they each have their own dedicated helper whose sole job is to keep them fed with the materials as close as it needs to be so all blane or sam has to do is concentrate on leveling those blocks [Music] each block gets leveled front to back then side to side then they get leveled with the blocks adjacent to them then the back of the block gets leveled to the back of the block adjacent to that to ensure that we have a straight line and then a string line also gets ran on it to make sure that