Skip to main content

Prepare and Compact the Base Foundation

1:03
6:08
30.2K views

At 1:03 in

Chapter 1-the Start of a new wall

What happens here

The initial phase involves preparing the foundation trench to the required depth and width. A layer of granular base material, typically crushed stone, is spread evenly across the trench. This material is then thoroughly compacted using a plate compactor to create a firm and stable sub-base. It is crucial to ensure this base is consistently level and well-drained, as it will support the entire weight of the retaining wall and prevent future settlement. The video shows workers raking and leveling the base material before compaction.

Goal: Excavate the trench and lay a compacted granular base of crushed stone to create a stable and level foundation for the retaining wall.

Tools and materials

  • Level (Spirit Level)
  • Plate Compactor
  • Rakes
  • Shovels
  • Skid Steer
  • String Line
  • Tape Measure
  • Crushed Stone / Granular Base Material

What they say

Hide

that's what we're gonna do [Applause] [Music] [Applause] [Music]

Auto-generated from the video audio.