The first course of segmental retaining wall blocks is carefully placed directly on the prepared and compacted granular base. A string line is used as a guide to ensure the front edge of the blocks forms a perfectly straight line. Each block is checked for levelness both front-to-back and side-to-side using a spirit level. Minor adjustments are made by tapping the blocks with a rubber mallet or by adding/removing small amounts of base material beneath them. The narrator highlights the strategy of starting from a central point and working outwards to ensure overall accuracy and symmetry.
Goal: Precisely place and level the initial layer of segmental retaining wall blocks on the compacted base, using string lines and levels for accuracy.
Tools and materials
- Level (Spirit Level)
- Rubber Mallet
- Segmental Retaining Wall Blocks
- Shovel
- String Line
What they say
(1,350 characters)Hide
What they say
(1,350 characters)Auto-generated from the video audio.