Skip to main content

Processing Old Retaining Wall Blocks for Reuse

10:55
13:31
38.2K views

At 10:55 in

TOUGH Wall Job & unexpected delays

What happens here

The mini excavator is used to carefully remove the remaining blocks from the old retaining wall. These blocks are then transferred to the skid steer. The narration highlights that only structurally sound blocks with minor aesthetic flaws are selected for reuse as base material for the new wall, as they will be covered. These selected blocks are then cleaned, stacked, and transported to the new retaining wall's location.

Goal: Old retaining wall blocks are carefully removed, cleaned, and transported to be reused as base material for the new wall.

Tools and materials

  • Bobcat 325 Mini Excavator
  • Skid Steer Loader
  • Old Retaining Wall Blocks Unspecified

What they say

Hide

[Music] the next step on this job is to get all of the rock that's surrounding the pool to go away [Music] but you'll actually see that we're leaving a good share of the old retaining wall in place [Music] we're gonna actually be building a new retaining wall in front of the old retaining wall and so the block that we peeled off from the top of the old retaining wall got scraped clean and can be reused as base for the next retaining wall and the reason it's only going to be used as base is because it will be covered up that way if there's any defects in the face of the block or the aesthetics no one will ever be able to see it but if the block has been structurally compromised it's already been thrown away the blocks you see us using have all been cleaned stacked and hand selected as base material

Auto-generated from the video audio.