Skip to main content

TOUGH retaining wall build. Day1

14:27
68K views

Video by Stanley "Dirt Monkey" Genadek

Stanley "Dirt Monkey" Genadek

What happens here

This video details the initial demolition and preparation phases of rebuilding a failing segmental retaining wall. It covers safely accessing the work area with heavy machinery over utility lines, removing old locking blocks, and identifying and excavating improper drainage material to ensure a robust and efficient landscaping solution.

Transcript

Hide

[Music] wow we're gonna be building a retaining wall just a little differently than the way most people would expect to see it done [Music] all right blaine is running the kitty cat out to our site uh we're stopping that stands we gotta grab a couple of things we're gonna meet him back at the yard and get all of our new slat tracks loaded up and get out onto our new site hi pretty kitty look at you hi i freaking love me some cats okay sign that stuff out [Music] all sorts of stuff running through here so if we straddle it if we put our track like right on it yeah right on it should be all right first challenge the boys run into is buried utility lines right where we've got to come in and go on be careful yep that's going to want to dig dig in holy crap that is a big wall they've also got a sprinkler system to work around and they're running those three flags over there just gonna make sure that we don't get these but the poster coming out except through the corner yeah okay so what we'll do today is probably get the couple courses off a couple off and then start scraping the rock in the bucket yeah get up there with the mini x and the key cat as the wall is shifted and moving out the pool the plumbing everything is being affected but we can't just go and rebuild the retaining wall as is we're actually going to use a hybrid technique where we borrow the strength from the old wall and add it into the new wall and over the course of the next three videos we're gonna show you exactly how we do that so let's get right into today yeah you can see this whole wall is it's blowing out and tipping and to bridge over those utility lines the boys lay out a system called slat traps and what this does is helps the machinery bridge over it without digging into the yard i like this alternative better than plywood because it folds up neatly and can be reused over and over again to make this hybrid retaining wall system work we only remove the top plane uses the bucket of the mini x to pop out the post to the fence which usually goes pretty good all right guys so we got rained out yesterday we got three about a little under an inch real quick but we're back out on our site today the plan is we're just gonna keep getting the old block out and then get rid of all that gravels to get the most capacity out of the trailer blaine calculates exactly how many blocks this can safely haul so every bucket full they start counting how many blocks go in the bucket and then they'll know how many blocks are going in the trailer all right so that's 42 on there after this so two more then 42 yeah they're gonna try to get 21 block in this bucket and each one weighs 83 pounds all right do me a salad and don't sling a rock said do me a salad and don't sling a but i only counted 20 on this one what did you guys come up with so i found out behind this wall they didn't use clear they got class five which is definitely not helping the water getting through that definitely a contributing factor to the water problems that this guy's having behind this wall so here's where it gets interesting and confusing at the same time although technically class 5 is a free draining material i wouldn't recommend it for a retaining wall application i have actually seen where engineering departments have specifically specced out class 5 as the solution to massive water problems in buildings before but that doesn't mean that i'd want to use it behind any one of my retaining walls but the biggest part of this retaining walls problem is not the fact that they use class 5 for the drainage it's the fact that they just didn't use enough of it [Applause] where'd you go little guy where'd you go oh there he is little tree frog look at remember when i asked you guys to count the blocks and how many you guys came up with well here's the reason why we're counting them all right you guys probably saw when we were filling up the bucket on the kitty cat that i was we were stacking them in there first of all personally i like to do that when we're getting rid of the block just for the simple fact you can take you can fit more in there i think it we timed it out it added like another 30 seconds stacking them in there instead of just throwing them in there willy-nilly uh we're also doing that on this site because blaine figured out how many blocks we can get in the trailer before it's overweight because of course he did that dude is way too smart to be doing this job anyways it's 85 blocks 85 blocks we can fit on the trailer and have it be just barely underweight so with that we're stacking them in there we're stacking 21 at a time 21 yeah 21 at a time so it's four trips in the bucket but on this job we've got to remove more than just the blocks all of the landscaping rocks surrounding the swimming pool also have to go on the next video you guys blaine and sam run into a bit of a challenge they've got a stump that has grown down and around the plumbing for the swimming pool and below the concrete and it's starting to jeopardize the sidewalls of the pool and they want to figure out if they can remove it or do they got to call in a stump grinder and on another job site we've got a brand new asv rt50 which i've never seen before it's brand new to the market we're testing that out and a whole lot more coming down the pipeline so make sure you guys stick around god bless go get me guys we'll see on another one

Auto-generated from the video audio.