Site Access and Problem Identification

0:00
14:27
68K views

At 0:00 in

TOUGH retaining wall build. Day1

What happens here

The initial segment of the video introduces the project, highlighting the problem of a severely bowing segmental retaining wall. The team uses specialized 'Slats Tracks' by Bobcat for heavy machinery to cross a lawn with buried utility and sprinkler lines without causing damage. The 'Slats Tracks' consist of interconnected plastic panels that distribute the weight of machinery, preventing damage to the turf and underlying infrastructure. This setup allows for the efficient and safe transport of equipment to the retaining wall site.

Goal: This step focuses on safely transporting heavy machinery to the retaining wall site using specialized tracks to protect underground utility lines, and introduces the failing retaining wall that needs reconstruction.

Tools and materials

  • Mini-Excavator — Excavating the retaining wall and drainage material
  • Skid Steer — Transporting materials and equipment, and for initial wall demolition
  • Slats Tracks Slats Tracks — Creating a temporary roadway for heavy equipment to prevent damage to the lawn and underground utilities
  • Utility Marking Flags Various — Marking the locations of underground utility lines and irrigation components

What they say

Hide

[Music] wow we're gonna be building a retaining wall just a little differently than the way most people would expect to see it done