Load and Transport Demolished Blocks
At 0:53 in
TOUGH retaining wall build. Day1
What happens here
To manage debris, the crew members manually load the removed locking blocks into the skid steer's bucket. This is done by carefully stacking the blocks to maximize the bucket's capacity while ensuring stability during transport. The team has calculated the maximum number of blocks that can be safely loaded onto the trailer without exceeding its weight limit. Each block weighs 83 pounds, and the goal is to load 21 blocks per bucket for a total of 85 blocks per trailer, just under the weight limit.
Goal: Workers manually load the removed locking blocks into a skid steer bucket, carefully stacking them to maximize capacity for efficient transport to a dump trailer, ensuring not to exceed the trailer's weight limits.
Tools and materials
- Dump Trailer Sure-Trac — Hauling away the demolished retaining wall blocks
- Hearing Protection Various — Protecting ears from loud machinery noise
- Safety Gloves Various — Protecting hands during manual handling of blocks
- Skid Steer — Transporting the removed retaining wall blocks to the dump trailer