Discover and Remove Improper Drainage Material
At 1:33 in
TOUGH retaining wall build. Day1
What happens here
After removing the top layers of the blocks, the team uncovers the drainage material behind the old wall. Instead of clear aggregate (like washed stone), they find 'Class 5' material, which is a mix of aggregate and fine particles. This material, while technically 'free-draining' when new, tends to compact and clog over time, preventing proper water flow and contributing to hydrostatic pressure behind the wall, which caused the wall to fail. The team then excavates this improper drainage material using the mini-excavator and shovels.
Goal: Upon deeper excavation, the crew discovers that 'Class 5' material, instead of clear aggregate, was used for drainage, which contributed to the wall's failure. This material is then excavated.
Tools and materials
- Gloves Various — Hand protection
- Mini-Excavator — Excavating the Class 5 drainage material
- Shovels Various — Manual removal and shaping of drainage material
- Skid Steer — Transporting the excavated drainage material
- Class 5 Aggregate Unspecified — The incorrect drainage material being removed
What they say
(272 characters)Hide
What they say
(272 characters)Auto-generated from the video audio.