Finalize Drainage Trench Excavation
1:53
14:27
68K views
At 1:53 in
TOUGH retaining wall build. Day1
What happens here
After identifying and removing the unsuitable drainage material, the team continues to excavate the area behind the retaining wall. This involves using both the mini-excavator and manual shoveling to create a clean, properly sloped trench that will accommodate the new, correct drainage aggregate and geotextile fabric. The goal is to establish a clear path for water to drain away from the wall's face, preventing future hydrostatic pressure issues.
Goal: The crew finalizes the excavation of the trench behind the wall, ensuring proper slope and depth to prepare for the installation of new, effective drainage components.
Tools and materials
- Hearing Protection Various — Protecting ears from loud machinery noise
- Mini-Excavator — Deepening and shaping the drainage trench
- Safety Gloves Various — Hand protection
- Shovels Various — Fine-tuning the trench shape and removing stubborn debris
- Skid Steer — Moving excavated soil and rocks
- Existing Soil and Rocks N/A — Material removed from the trench
What they say
(2,491 characters)Hide
What they say
(2,491 characters)Auto-generated from the video audio.