Final Site Preparation and Cleanup

12:29
13:31
38.2K views

At 12:29 in

TOUGH Wall Job & unexpected delays

What happens here

After all major excavation and material removal, the ground around the pool area is rough graded to ensure proper water drainage away from the structure. The newly installed base material for the retaining wall is compacted using a plate compactor. All equipment is secured, and exposed areas are tarped in anticipation of upcoming rain, concluding the initial site preparation phase.

Goal: The work area is graded and compacted, and all equipment and materials are positioned for the next phase of construction, with an emphasis on weather preparedness.

Tools and materials

  • Plate Compactor
  • Tarps

What they say

Hide

102 degrees uh we're we're at a spot we're comfortable stopping uh we have all the block that we're going to reuse for the base of the new wall cleaned off and stockpiled um we got the grade fixed around the pool so that's gonna be shedding water away we got that packed uh we got a load of junk and rock out brought some material in so yeah so we got everything all tarped up two looks like we're supposed to get a whole bunch of rain this weekend and uh let me see what else oh my god yeah all right well i think that's all i got yep start building on friday [Music]

Auto-generated from the video audio.